Loading...
Checkoff Sheet MS-2014-01625.tif 2 009. I NTERNATIONAL RESIDEN CODE CITY OF 13LAIR REROOPW.G. CHECKOFF SHEET i Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to Perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. 1 Lx? Property Address; Contractor or Homeowner (if self) ; Vii' I f �= Permit #; WIS -2014- Installation Date: ` . YES NO �. The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907:1) l 0 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at feast from the eave's edge_ to •a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) ' STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) C� EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) �ff 13 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6), ' d9 /S Stgna re of Primary Installer Date n Dat ature of Permit Holder e