Checkoff Sheet MS-2014-01625.tif 2 009. I NTERNATIONAL RESIDEN CODE
CITY OF 13LAIR REROOPW.G. CHECKOFF SHEET
i
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to Perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
1 Lx?
Property Address;
Contractor or Homeowner (if self) ; Vii' I f �=
Permit #; WIS -2014-
Installation Date: ` .
YES NO
�. The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907:1)
l 0 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at feast from the eave's edge_ to •a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
' STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
C� EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
�ff 13 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6),
' d9 /S
Stgna re of Primary Installer Date
n Dat ature of Permit Holder
e