Loading...
Checkoff Sheet MS-2014-01433.tif 2009 INTERNATIONAL RESIDENTIAL CODE I i CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to lair C ity Hall prior to Final Inspecti 21 S "h St reet, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspection$ which would not interfere with reroofing work, please Indicate compliance with the following requirements full®wiria this reroofing job. Permit #• -U Installation Date: • i YES NO The materials and methods H of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTI ON INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was irltalled and extends at least from the eave's eda® to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXIST lNG C ®VERING WAS MOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 &0 RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5) PLASHING INSTALLED PROPERLY- Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bite Sri us materials are to be. adhered shall be primed prior to installation. (8907.6) Sigh - rim atelier Date � h/ Ider D to