Checkoff Sheet MS-2014-01433.tif 2009 INTERNATIONAL RESIDENTIAL CODE
I
i
CITY OF BLAIR REROOFING CHECKOFF SHEET
R eturn to lair C ity Hall prior to Final Inspecti
21 S "h St reet, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspection$ which would
not interfere with reroofing work, please Indicate compliance with the following requirements
full®wiria this reroofing job.
Permit #• -U
Installation Date:
• i
YES NO
The materials and methods H of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTI ON INSTALLED An ice barrier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was irltalled and
extends at least from the eave's eda® to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXIST lNG C ®VERING WAS MOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
&0 RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5)
PLASHING INSTALLED PROPERLY- Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bite Sri us materials are to be. adhered shall be primed prior to installation. (8907.6)
Sigh - rim atelier Date �
h/
Ider D to