Checkoff Sheet MS-2015-00205.tif U4 /US /LU10 1L:O1 IAA 4UZ044Z114 WJ UU1 /UU1
2009 INTERNATIONAL RESIDEN C.ODE
CITY OF BLAIR i
S HEET
R CHECKOFF
Return to lair City ball prior to Final In pecti ili
21 tip S treet, Blair ME 6800
Because of limitations caused by the infeasibility to perform detaiied Inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirealent-
f2lig ink this reroofing job.
Property Address: —
d
Contractor or Homeowner (if self)
P ermit #9 ®
installation Date
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE P Q : An ice barrier that consist: of at least two layers of
underlayment or of a, self- adhering polymer modified bitumen sheet wag ins talled and
extends at least from the eave's ege to a point at leas — n ches insil
_ the exterior
wall line of the building, (8905.2.7,1)
STRUCTUR, &L COMPONENTIc ARC: L iei!l a The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the root covering system, (8907.2)
EXISTING OVERING W EIIA p: . Existing roof covering was removed for one
of the reasons required by section R907,13
I
DID NOT USE R IJ ST ED ETAL
QR FLAB (E-GING: Existing vent flashing, metal edge.
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASH_ h G I T)9.LEI) P %Q PERLy� Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions, Metal flashing to which
bituminous materials re to be adhered shall be primed prior to installation. (FZ907.5)
e of Pri ary Instal � date v - - --
Signature of Kermit Holder pate