Checkoff Sheet MS-2014-03089.tif i
"WU 11V I r-KNATIONAL RE$IDENTIAL CODE'
I
CITY OF BLAIR REROOFING CHECKOFF' SHEET
Return to Blair C ltd, Hall prlo
218 S F nsection
to S treet, Blal r, NE 6800
Because of limitations caused by the infeasibility to perfo OW d dta� S J
Intarfero with reroofing work, please Indicate cor �ll�� With the which would
fOffg!v! thls�reroofing jab, f ollow ing requirements
Pro brty Address:
Contractor or Homeowner (if self
Permit# MS --2014
Installation Date:
YES NO
The materials and methods of a
roof covering comply v�ritl��Rgrmerts o f tr�uIldir � �lin'th exi
SCE PROTECTION l ST�#L��p, An ice barrier that conslst of at leas two layers of
under " me nt or of a self-adhering polymer modified bitumen sheet was al n
extends ' a : t leas fro Elie vg's ed a to a point a bast 94 s i � the
wail line the building. (R905,2.7.1) xterlor
STRUCTURAL, CQMPO E T Al
Capable of supporting t roof �ber, tructur t: of Components are
M, 101
that will be encountered durin � 1 roof material and equipment loads
cc v6rir g stern. (R907-2)
cove
VE
EXISTING COVERING l�lt�l�� Existing roof ring was removed for one
of the reasons requl btlor 17.
k
1lLt �T�" t.l�l E x Is vent flashing, meta
dr�ln r�utlet, collars or Ott piste flashln
re not reinst If rested. lgg e
' Sl INST l�n P ahing shall be reconstructed in ac
With approved rnaniafactd er � Nation Instructions, Metal flashing to which 11 -ilous materials are to be Ord shall be Primed prior to Installation,
S ign Prirnatt lnsta r
Z D nature of Per older
Date