Loading...
Checkoff Sheet MS-2014-03089.tif i "WU 11V I r-KNATIONAL RE$IDENTIAL CODE' I CITY OF BLAIR REROOFING CHECKOFF' SHEET Return to Blair C ltd, Hall prlo 218 S F nsection to S treet, Blal r, NE 6800 Because of limitations caused by the infeasibility to perfo OW d dta� S J Intarfero with reroofing work, please Indicate cor �ll�� With the which would fOffg!v! thls�reroofing jab, f ollow ing requirements Pro brty Address: Contractor or Homeowner (if self Permit# MS --2014 Installation Date: YES NO The materials and methods of a roof covering comply v�ritl��Rgrmerts o f tr�uIldir � �lin'th exi SCE PROTECTION l ST�#L��p, An ice barrier that conslst of at leas two layers of under " me nt or of a self-adhering polymer modified bitumen sheet was al n extends ' a : t leas fro Elie vg's ed a to a point a bast 94 s i � the wail line the building. (R905,2.7.1) xterlor STRUCTURAL, CQMPO E T Al Capable of supporting t roof �ber, tructur t: of Components are M, 101 that will be encountered durin � 1 roof material and equipment loads cc v6rir g stern. (R907-2) cove VE EXISTING COVERING l�lt�l�� Existing roof ring was removed for one of the reasons requl btlor 17. k 1lLt �T�" t.l�l E x Is vent flashing, meta dr�ln r�utlet, collars or Ott piste flashln re not reinst If rested. lgg e ' Sl INST l�n P ahing shall be reconstructed in ac With approved rnaniafactd er � Nation Instructions, Metal flashing to which 11 -ilous materials are to be Ord shall be Primed prior to Installation, S ign Prirnatt lnsta r Z D nature of Per older Date