Loading...
Checkoff Sheet MS-2014-02688.tif 09 INTER" ONATIONAL RESIDENTIAL CODE C ITY OF BLAI Re turn to lair Cit Hail prior o Final Inspection 1 1 Street, Blair, NE 680 Because of limitations caused by the infeasibility to. perform detailed 'inspection which would � not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Permit #: # �/ l �- ( ®;� Co Installation Date: y i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.9) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that, will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signatur of Prj ary Installer Date Sig tore f ermit 1 er -�-- Date