Loading...
Checkoff Sheet MS-2014-02357.tif I i I i 2009 INTERNATIONAL RESIDENTIAL CODE CIT OF BLAIR REROOFING CHECK R OFF SHEET eturn t4 Blair City' Hall prior to Final inspection 218 �1 Street, Blair, NE 68008 i Because of limitations caused by the Infeasibility to perform detalled Inspections which would ( not interfere with reroofing work, please Indicate compliance with the following requirements follA this reroofing job. Property Address: 44 1 `1 Contractor or Homeowner if self J Permit #: Installation Dates YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave'se to a point at least 24 inures inside the exterior' wall line of the building. (8905,2,7,1) STRUCTURAL COMPONENTS ARE SOUND, The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907. ©ICS NOT USE RUSTED IIIIETAL OR FLASHING: Existing vent fleshing, metal edges, Train outlets, collars or metal counter - flashing were not reinstalled if rusted, (8907.5) FLASHING INSTAL!. Eli PROP RLIr'y dashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,5) Signa ary er Late Signature o ' e, Date i i