Checkoff Sheet MS-2014-02121.tif i
i
I
E
C111 OF BLAIR R EROOF114G CHFCKO FF SHEET
Return to Blair City Hall prior to f=inal Inspection
218 S 16th Street, Blair, NB 68008 i
l
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing
job.
Permit #1'
i
Installation Date
YE,S' NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (13907.1)
�I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
CI FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which �
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I �
Sign " of Pr' ary Installer Date
Signatur6 of Permit Holder Dale