Loading...
Checkoff Sheet MS-2014-02121.tif i i I E C111 OF BLAIR R EROOF114G CHFCKO FF SHEET Return to Blair City Hall prior to f=inal Inspection 218 S 16th Street, Blair, NB 68008 i l Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Permit #1' i Installation Date YE,S' NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (13907.1) �I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) CI FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which � bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I � Sign " of Pr' ary Installer Date Signatur6 of Permit Holder Dale