Checkoff Sheet MS-2014-02064.tif Apr, 3,201h 2:48NM Naul Davis -Sioux City No• 0309 N• 14
2`009". INTERN Al"' RESIDENTIAL CORE
CITY OF 13LAIR REROOF190 CHECK'OFF SHEE!
R eturn to Blair City Hall prior tb Final Inspection
218 S 16 Street, B lair, NE 60000
B ecause of limitations caused by the InMalbility to perf'>arm detalled Inspections which would
jjQg interfers with raroofing work, please indicate compllance Vilth the following requtreMenfs
f — ollowWa this reroofing job.
P Addms -. x` 15 5 ISM 1 ebs-& ' .-
Gdntractor or Homeowner (Ifsel� : F 4 f r
Permit #: - 2O14- 6 & ,.
Installation We: ;
YES No
The materials and maitiods of application used for recovering or replaging the eKistlnq
roof covering gomplywith the requirements of the building code.
bE I'R INSJALL b : An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer mots fled bitumen sheet was Installed and
Extends at least from the mWs edge try -a point at least 24 Inches inside tha extsrlor
wall line of the building. (11005.2.7.1) '
r '. I
STRUCTURAL COMPONENTS ARE BMW: The structural roof components are r
capable of supporting the roof overing systerri and the material end equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
ISTINC GOO ERING WAS REMOVED rciating rgpf covering was removed for bna
df the reasons required by section' 1007.5
[_XD NOT USF, RUEED METAL OR I.,A .Away Wating vent flashing, metal edges,
draln outlets, collars or metal opunter flashing wore riot relnstalled If rusted. (8907.5)
F LASHING T'ALLEQ PP.0PE Y Flashing shall bq reconstructed In accordance
Wth approved mentdhOurees Installation Instructions, Metal flashlttg to which
bituminous rrlaterlals are to be adhered shall be primed prior to installation. (11007.0),
Szg at�lre of Primary ns alley p
-ell
Ana are of erml older sat
• 4
f