Loading...
Checkoff Sheet MS-2014-02065.tif Apr. 1101h 2:48FM Naul Davis -Sioux City No. 0309 F. 1h N JA Now CITY OF, 13LAIR REROOPIgG CHECKO'FF SHEET R eturn to lair It y Mall prlior t Final Inspection 1 8 1 Street, B lair, NE 6$008 L f Isecause of limitations caused by the Infeaslblllty to perform detailed inspections which would n4 Interfere with reroofing work, please indicate compliance With the following requlretnents i'ollowin ji this reroofing job. Pr operty Ad dress: A / I no—b b i Ale' ��""ex u -- Cdntractor or Homeowner (If salt} R i Permit : MS -2014- 020 lrtsf�l[atlan l��fe� . YES NO Tho materials and methods of application used for recovering or replapIng the existing roof po�lering comply with the requirements of the building ood�. (R9g7:'1) in tOE MOtECTION INSTALLED An ice harder that consista of at least two Iayem of underIsyment or of a self - adhering polymer modified bitumen sheetwas in stalled and extends at [east from the eave a edaa to-a point at least 24 inches Inside the a )d erior wall line of the building. (0905,2.7.1) ' TRUCTIlRAI,._COMPONENTS ARE OUNIaK T,he structural roof components are � capable of supporting the roof t overing systerri and the material i4nd equipment loads thatwlli be encountered during installation ofthh roof covering system. (11907.2) a EXISTING COVERING. WAS REM OVED. , Edsting roof cove was removed for one of the reaaond iequlred by saoflo R907.3 DID NOT USE RUSTED METAL OR FLASHIN(k Existing vent tWhing, metal edges, drain outrets, colldrs or meted opunter -fl shing woro not reinstalled if rusted. (11997.9) FWl-IING IN PROPEF�LY. Flashing shall bq reconstructed In accordance with approved manufacturefe Instaliatloo Instrucaons. Metal flashing to which bituminous rriaterlals are to be adhered shall be primed prior to Installation. (11907,0), ganature of Primary installer p e p S ignature of Pen - nit Holder :sate