Loading...
Checkoff Sheet MS-2014-02063.tif i Apr. 3.201h 1:WM Faul Davis -Sioux City No, 0309 F. 8 INTERNATIONA ESIDEN. '. -t CODE CITY OF 13LAIR �G s R eturn to Slair City Hall polor t $il l In actin 218 S "h street, B lair, NE 68008 Because of limitations caused by the h1famalbilk to porffirm detailed 11n peations which would Do Interfere with rerootIng work, plaaae indicate c6implian o with the following requlrar6►ants hL11 wfnsr this reroofing job, P roperty AddrEa ac r I Contractors or Homeowner (if Sel 0 i � r��zA Installation Nts: d p. YES NO The materlals and methods of applicatlon used for monvering or replacing the existing i roof covering comply with the requirements of thin building code. (R907 :1) CC13 Pkt]7 IMMON lNgAUD: An lca barrier •that consists of at least two layers of underlaymont or of a self adhering polymer modified bitumen sheat was installed and Extends at Iesfrrrr the eaue'a edge to.a po[rit al lei_ Encliea Pu�.s6de #lie rxterlai° wall lime of the building. (11805.2.7..1) -- Y MUCTURAL C UP , 1 0 r ° "ho atruotural roof components are � oapable of suppart(ng the roof twov ering ��Vstem and the material rind equIpment loades that will be encountered during instal[atlon of the roof covering systegri. (RO07.2) E is-ri s C_'V ERIN G, WA S Nl ;, xcicti ng rppf covering was removed for bile of tho reasons' required by aectiora R9073 1311) NOT USE BH P 1ETA l � OR 1 IN , e Pxlsti vent flas hing, metal e drain ou#l'ets, colkra or metal opunter- flaef1$ng wore not reinstalled If ru (ROUX) 12� FI_,4 HIN INSTALLED PRQPElrkLW dashing Wiall bq reconstruoted in accordan ce with approv6d manufacturer's Installativrr Instructions. Metal ffashing to which blturnInous materials are to be adhered Mall be primed prior to Installation. (11007.6) a Lure . of Primary installer DAN signature of P it HoldeC.... . Detd . a i I