Loading...
Checkoff Sheet MS-2014-02058.tif Apr. 3.201D 1.4 /FM Naul Davis -Sioux City No. 03U9 N. 11 - COM CITY OF, I. x _ FF SHE Return to Blair City Mall prior to Final Inspection 21 8 16 Street, B lair, NE 68008 13ecause of limitattana caused by the Infoaslblilty to porf6rm detailed inspentions which would Pot Interfere with reroofing work, plea'so Indicate compilance with the following requlrephents fol Mind this reroofing job. ' Properly Addreas. G r41 7 J f c 16a_ ' . c: Gontractdr or Homeowner (Ifself w c.c - das t r� ! Pormit o: 2014- r Installation Date: ''DES No r , The materials and methods of application used for recovering or replaging the existing roof covering comply with the requirements of the building cods. (8907.1) 9E_ k0YEGT10N INSTALLED An ice barriar that corialats of at least two layers of underlayment or of a self-adhering polymer modified bitumen shoat was installed and extends ftt least from the eava's edge to -a point at least 24 Inches inside the ex#erlor , 'wall line of the building. (RD05.2.7.1) . S'i' UCTURAL CUUONLNTS ARE SOUNpK The struotural roof components are r ...�.��� S capable of supporting the roof Dovering System and the material and equipment loads that will be encountered during installation of the roof covering ay'atem. (8907.2) EXISTII a COVERING WAS REM Existing ropf covering was removed for brie of tho reasons required by section 8907.3 glD NOT USE RUSTED METAL, gRELASHING:1, Existing vent flashing, metal edges, drain out[ets, collars or metal opunfer flashing wore not reinstalled If ruated. (R907,6) FL45Hl G INSTALL99 IRO PERLY: T lashing khall bq reconstructed in acoordance with approved manufacturer's InsfallatioU inatructtans. Metal flashing to which biturninaus materials are to be adhered shall he primed prlorto installation. (11907.8) Slgnatuee of primary Installer ~ ate a S ([� I n 11 Lure of permit Holder 10 atei y