Checkoff Sheet MS-2014-02057.tif Apr. 3.1016 1.46FM Naul Davis -Sioux City R'ES No. 0309 N• 11
! ,
CIT OF 13LAIR REROOFR40
etur o Blair My Hall plrlolr b in�al inspection
1 S 1I� Street, 13 1alr y NE 6$008
Because of limitations caused by the Infeasibility to parform detailed inspectlona which mould
z.oA Interfere with reroofing w'ork� pieaae Indicate compliance with the following requlret ents
faU RMaM this reroofing job.
�' a,n r l
Property Address: - - - - - —� r� � tetra .
Contractor or Homeowner if self : �.� � o- l: r r t c �✓
Permit um. CIS -2014- 6
Installation i]O
Y ES ■ ES NO
Ths materials and methods of application used f qr recovering or replaying the existing
roof !covering comply with the requirements of the building cads. (R907A)
tQE PkCTtCTION IRTALLEP An lee berrler that con$Iste of at lust two layere of
underlayment or of a self-adhering polymer modified bitumen sheet was instal and
dxtends at least from the eaye'a edge to o point of least 24 Inches Inside the exterior
• wall line of the building, (RD05.2.7.1)
STRUCTURAL G0MP0NENT8_AW8OMM structural roof comj'onents are
capable of auppor•ting the roof Covering system and the material qnd equipment loads ,
i that will be encountered during Ins allatlon of the roof covering system. (11907.2)
EXISTING CGV ERING. WAS REMOV404 Existing r99f covering was removed for one
of the reasons required by section' 8907.3
DID NOT USS RUSTED METAL OR F Existing vent flashing, metal edgas,
drain outlets, collars or metal cpunter flashing wore not reinstalled if rusted. (11907.5)
S
, LASHING INST`ALLEQ P&Q_29ffM Flashing l hall bq reconstructed In accordance
with approved manufacturees installatlop instructions. Metal flashthg to which
bituminous rdaterlala ara to be adhered shall be primed prior to Installation. (11907,6)
• r -
'i Ka4 e of Primary In taller :.e..
IA
id — Wore of — P0 61t H0 Dot
I