Checkoff Sheet MS-2014-02055.tif Apr. 3. 2:WM HauI Davis -Sioux City No. 0309 N. 1
2009 INTERNATIONAL RESIDENTIAL
CITY OF, 13LAIR REROOP100 CHECKO'FF SHEEt
Retu o S laIr City H all prior tib Final n p c i r
218 8 16 Street, 811air, NE 68008
Y
j •1 .
Because of limitations caused bYthe InfeassibllRyy tug parffhrrn dotalled Inspectlone which wosuld
not IntOrfOrG vuath rerooting work, please Indicafs compliance vdth the follovuing reajufm6ients
f2 !La3ft this mroof'ing fob. 4
P rope Addrei3a., 1 � .-' L..r/ /.c _, ��
I r` 1� 6
contractor or Homeowrim (if see
i
Permit .- M d.
o P ..
Installation Dada - ...
YES NO
The materials and methods of applloation used ffor recovering or replaging the Wisting
roof povering gornplywlth the requlremenlc of the building cods. (11 907.
ICE IP OfFE TI N INSTALLED An Ice barrier that odrisists of art lust two layers of
underlayment or of a self -adhering polymer modified bitumen sheet was lrgLLgj and
extenda at leastfrom the eg 9g edtas to-a p oint at least 24 Incises Inside the e xterior
wall line of the building. (RD05.2.7.1)
T OTURA COMPO AR E 0 D; `t ha struotuarel root com'onents are �
oapablo of supporting the roof hovering aystani and the material 4nd equipment, loads
that will be oncountered during Installation of the runoff covering system® (11907.2)
l [STING COVER ING.WAS REMgW N Existing r99ff covering was removed for bile
of the reasond required by seotlon R907.
DR) 140T USK RUS MET AL OR W 1N'P, Existing vent flashing, metal edges,
drain outlets, colike or metal opuff er fflasi�lu�g wore not reinstalled if ru ed. (R907.6)
PLA 'S ' HING lKMLL LERg PEKLy_ Flushing �F lall he reconstricted In accordanc
with approved menuffacturofs installatioi) Instructions. Metal llas*g to which
bituminous ntaterlala are to be adhered shall be primed prior to Installation (1190 ,0),
i m ure bff pri ry In. lallar
i'gnature of Permit Holder Wd