Loading...
Checkoff Sheet MS-2014-01942.tif I E I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to Blair City Hall prier to Final Inspection 218 p 1 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requiremen f21l2wing this reroofing job. Property Address; w� Contractor or homeowner (if self).- Permit #: Installation bate. YES Na The materials and methods of application used for recovering or rep lacing the exis p g � roof covering comply, with the requirements of the building cads. (R907. 1) ICE PROTECTION INSTALLED. An ice barrier that consists of at least two l ayers of underlayment or of a self-adhering polymer modified bitumen sleet was installed and extends at least from the eavg's edge to a point at least 24 inches Inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL GtlUlPt3NEhITS ARE SC?UNC3 The structural roof comp onents are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (1907,) EXISTING COVFPING WAS REMOVED; Existing ro of covering w as removed for o of the reasons required by section 8907.3 o ne DID NOT USE RUSTED METAL OR FLASHING: existing vent flashin g metal edges drain outlets, collars or metal counter- flashing were not reinstalled` if rusted. (R907*5) FLASHING INSTALLER PROPERLY. Flashing shall be reconstructed In accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (I07,0) Signatu staller . Date Signature o it bolder bate I