Loading...
Checkoff Sheet MS-2014-01717.tif Apr. 3, 201D 2:46FM F'auI Davis -Sioux City No, 0309 F. 10 INTERNAT CITY OF 13LAIR REROOFING, CHECKOFF SHEET Return to B lair City Hall rio' r ter Final Inspection 218 8 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility t9 perf6rm datall+ed lnapectiona which would not Interfere with reroofing work, please indicate compliance with the following requlre fnents foll9wing thts reroofing sob. j LL II Property Address -. Gontractdr or Homeowner (If self) : At vt:s ` i I Permila �. S 014" 6 17 In stallation Date., Jtj, c4 2 6 (� , NO YES NO The materials and methods of applicatlon used fur recovering or replaiqing the exisEing roof covering gornpIVwith the requirements of the building code. (8907:9) I� ICE PhD ftQTl0N INSTALLED Arx ice f�arri erfhat consists of at least two layers of j underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at feast ?4 inches inside_ exterlor • wall line of the building. (RD05.2.7.1) S TRUCTURAL COMPO P+DNENTS ARir Sg The struatural roof componants are � capable o supporting the roof hovering systarri and the material and equipment loads that will be encountered during installation of the roof covering system. (119072) RKISTim coyepuNG. wAs REM OV M Existing roof covering was removed for bne of the reasons' requIred by saotlori R907.3 DID NQT Mg RUST1 =D 1VfETAL, qAf_LA�H�N�� Etcisking vent flashing, metal edges, drain outrete, colleire or metal cpunter- flashIgg were not reinstalled If rusted. (11907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approvad manufacturer's Insta.11atlop Instructions. Metal flashing to which { bituminous materlais are to be adhered shall be primed prior to installation. (R007.6) "i at re of primary Installer did 31 0) Pgn tare of Permit Holder Deter' .