Checkoff Sheet MS-2014-01717.tif Apr. 3, 201D 2:46FM F'auI Davis -Sioux City No, 0309 F. 10
INTERNAT
CITY OF 13LAIR REROOFING, CHECKOFF SHEET
Return to B lair City Hall rio' r ter Final Inspection
218 8 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility t9 perf6rm datall+ed lnapectiona which would
not Interfere with reroofing work, please indicate compliance with the following requlre fnents
foll9wing thts reroofing sob. j
LL II
Property Address -.
Gontractdr or Homeowner (If self) : At vt:s
` i I
Permila �. S 014" 6 17
In stallation Date., Jtj, c4 2 6 (� ,
NO
YES NO
The materials and methods of applicatlon used fur recovering or replaiqing the exisEing
roof covering gornpIVwith the requirements of the building code. (8907:9)
I� ICE PhD ftQTl0N INSTALLED Arx ice f�arri erfhat consists of at least two layers of j
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at feast ?4 inches inside_ exterlor
• wall line of the building. (RD05.2.7.1)
S TRUCTURAL COMPO P+DNENTS ARir Sg The struatural roof componants are �
capable o supporting the roof hovering systarri and the material and equipment loads
that will be encountered during installation of the roof covering system. (119072)
RKISTim coyepuNG. wAs REM OV M Existing roof covering was removed for bne
of the reasons' requIred by saotlori R907.3
DID NQT Mg RUST1 =D 1VfETAL, qAf_LA�H�N�� Etcisking vent flashing, metal edges,
drain outrete, colleire or metal cpunter- flashIgg were not reinstalled If rusted. (11907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approvad manufacturer's Insta.11atlop Instructions. Metal flashing to which
{
bituminous materlais are to be adhered shall be primed prior to installation. (R007.6)
"i
at re of primary Installer did
31 0)
Pgn tare of Permit Holder Deter' .