Loading...
Checkoff Sheet MS-2014-01520.tif I i I I 2009 INTERleATIONIAL RF CODE� CITY OF BLAIR KER00FING GUCKOF1° SHEF`l Return to Blair City Hall prior to Final Inspection ' 218S 16 i Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements l followin this reroofing job. Permit#: fil Installation Date: _ I YEF NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) �) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edae to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 rl NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) �1 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) q✓ J 1 Sign of Pr' ary Installer Date Signal of Z Permit Holder Date