Checkoff Sheet MS-2014-01520.tif I
i
I
I
2009 INTERleATIONIAL RF CODE�
CITY OF BLAIR KER00FING GUCKOF1° SHEF`l
Return to Blair City Hall prior to Final Inspection '
218S 16 i Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements l
followin this reroofing job.
Permit#: fil
Installation Date:
_ I
YEF NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
�) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edae to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
rl NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
�1 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
q✓ J
1
Sign of Pr' ary Installer Date
Signal of Z Permit Holder Date