Checkoff Sheet MS-2014-01432.tif I
I
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to lair Cit Hall prior to inal Inspection
Street, Bla NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing hobo
Permit:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PR T��"rlGt� INS'rALL.� ® ; An Ice barrier that consists of at least two layers of
under
ment or of aself- adhering polymer modified bitumen sheet was installed and
exfiends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building, (11905.2.7.1)
STRUCTURAL CQUI ®NENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS MOVED. Existing roof covering was removed for one �
of the reasons required by section R907.3
NO RUST D METAL 0 -- R FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (11907.5)
FLASHING INSIALLED PROPERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
biti us materials are to be adhered shall be primed prior to installation. (R907.6)
�i rime staller Date
-/'7v
lder ®te