Checkoff Sheet MS-2014-01180.tif I
2""009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218S16 1h freet, Blair, NE 688
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please i ndicate compliance with the following requirements
following this reroofing job.
Property Address:
I A cot
Contractor or Homeowner (if self)
Permit #: MS-20J _ ..)
Installation Date:
Y
NO
i
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907,1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends ' at least from the eave's edae to a point at least 24 inches inside the exterior
wall line of the building. (R9O5j 2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material. and equipment loads
that will be encountered durind installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
I
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
Train outlets, collars or metal cl unter- flashing were not reinstalled if rusted. (R907,5)
FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)