Loading...
Checkoff Sheet MS-2014-01427.tif NTERN �K��'� �T L AIR RR inspection C ITY ®F B Ci Hall prior tb final Insp Return to Blair �hY et flair, N' 6800$ 2,t 0 S i e stre et, which would d inspe {° e rform re uireinents • s caused by the infeasibility p Hance with th of limitat e following q Because ere with reroofing work, ion lease in comp n ot, interf p followin this rer oofing Job. �+ �� i (�. -) __ Property Address. Contractor or H C11 self) Permit #: M S-20 . ��� � • C installation Date: the existing O 'cation use or replacing YES N code. (89. and of the building ® The materials methods �[ °e Cequd for recovering 07 �Cements roof covering comply w ers of barrier that consists of at least {abed and [� f- adhering polymer modified bit inches inside the e eCor i ICE PROTECTION [NSTALLED� An ice underlayment or of a se at least from the eave's ed e to a point at le extends 8905.2.7. wall line of the building. ( co mpo nents are' ONI ARE SOUND• a nd eq The stru ° {ural roof com ui ment loads C3 STRUCTURAL COMP s stern and the ma t e r i a l a 8 907.2) . orting the roof 'covering y s stem. capable of supp feted during installation of the roof covering y that will be encountered roof covering was removed for one COVERING WAS REMOVED: Existing E;(ISTIIdO aired by section 8907.3 Of the reasons req vent flashing, metal edges, W not reinstalled if rusted. (8907.5) . RU METAL OR PLASH[ wO: Existing C3 DID NOT IJSE R- drain outlets, collars or metal counter-flashing cted in accordance Shall be reconstru t which G INSTALLED PROPERLY; Flashing lions. Metal flashing 890 ?.6). (� PLp,SHIN rimed prior to installation. with approved manufa rte to be adherred shall be p bituminous materials a Date Signature of prima yr. -- Date ermit Holder