Checkoff Sheet MS-2014-01335.tif APR-1-2015 01:06P FROM:PROFESSIONAL ROOFING 14023304519 TO:4024264195 P.1
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior inal Inspection
218 S If)" Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
foII2.wLn_q this reroofing job.
Property Address:
Contractor or Homeowner (if self)
Permit 0: MS-20
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's Once to a point at least 24 inches inside the e exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (1907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashMg, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. 0907.5)
FLASHING .114STALLE11F OP LY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (IR907.6)
signature of Primary �ler Date
,)nsta
-, I�; - gnaiure df Molder Date