Loading...
Checkoff Sheet MS-2015-00083.tif ZUU9 INTERNATIONAL RESIDENTIAL CODE CITY i O F . r Return to B lair C it y H qtIpport6fin 11p; qtio ( %; 218 S 16 S treet, 81 air, N 58 Because of limitations caused by the Infeasibility to perform detailed Inspections: which world � not interfere with reroofing work, please indicate compliance with.the following !requIre rients � followings this reroofing job. Property Address:, �. Contractor or Homeowner (if self) �' 0 V 6 ` ` low- P ermit: MS- 20 1 —L- ( - Y Installation Date. CBS NO The materials and methods of application used fQr recovering or replaQing the existing roof covering comply with the requirements,of the building code (8907) ICE l'�Of CTION INSTALLED An Ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the'ea've`s "edge "to',a paint at le'ast'24 inches inside the exferlor • wall line of the building. '(R905.2.7.1) STRUCTURAL COMPONiNTS ARE SOUND ural of . r oof c Th str u ; ,,h , omponents are capable of supporting the roof covering.systen and the material,and cqulprrient loads that will be encountered during installation of the roof covering system. (R907,2) EXISTING COVERING WAS REMOVED. Existing i� roof coveri wasl.emoved for on e _ of the reasons required by 'sectlon R907,3 DID NOT USE. RUSTED METAL OR PLASHING, Exlsting,vent flashing,';mefai edges, � drain outlets, coliars or metal counter- fiasliirig were not re(nstalled If rusfed {R907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance with approved `manbfactur6r's Instructlohi ;"�N6tal- flashing.toWhich" j bituminous materials are to be adhered shall be primed prior to Installation. (R907,6) f tur ma nsta D attire a P o! . er Dat I