Checkoff Sheet MS-2015-00083.tif ZUU9 INTERNATIONAL RESIDENTIAL CODE
CITY i
O F . r
Return to B lair C it y H qtIpport6fin 11p; qtio
( %;
218 S 16 S treet, 81 air, N 58
Because of limitations caused by the Infeasibility to perform detailed Inspections: which world �
not interfere with reroofing work, please indicate compliance with.the following !requIre rients �
followings this reroofing job.
Property Address:,
�.
Contractor or Homeowner (if self) �' 0 V 6 ` `
low-
P ermit: MS- 20 1 —L- ( -
Y
Installation Date.
CBS NO
The materials and methods of application used fQr recovering or replaQing the existing
roof covering comply with the requirements,of the building code (8907)
ICE l'�Of CTION INSTALLED An Ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at least from the'ea've`s "edge "to',a paint at le'ast'24 inches inside the exferlor
• wall line of the building. '(R905.2.7.1)
STRUCTURAL COMPONiNTS ARE SOUND ural
of . r oof c Th str u ;
,,h , omponents are
capable of supporting the roof covering.systen and the material,and cqulprrient loads
that will be encountered during installation of the roof covering system. (R907,2)
EXISTING COVERING WAS REMOVED. Existing i� roof coveri wasl.emoved for on e _
of the reasons required by 'sectlon R907,3
DID NOT USE. RUSTED METAL OR PLASHING, Exlsting,vent flashing,';mefai edges, �
drain outlets, coliars or metal counter- fiasliirig were not re(nstalled If rusfed {R907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance
with approved `manbfactur6r's Instructlohi ;"�N6tal- flashing.toWhich" j
bituminous materials are to be adhered shall be primed prior to Installation. (R907,6)
f
tur ma nsta D
attire a P o! . er Dat
I