Loading...
Checkoff Sheet MS-2014-01060.tif I 03/30/2015 :58 FAX 40253321 . -. U001/001 2009 INTERNA " p e CITY OF I 13LA REROOPIaG' J Return to lair City Nall prior to Final inspection j 21 0 S 16 Street, Blair, NE 08000 � secause of limitations caused by the infeasibility to parf6rm detailed inspectlone which world aOA lnterfers with reroofing work please indicate compliance with the following requirap} snts folloVinq this reroofing J6b. rr Property Address -, ,y7�a1�� 5 7 ( F ' r Contraotor or Homeowner (if self) : v7- Permit o: MS-2014- -- ' Installation bate: YES No The materials and methods of application used fcr recovering or replaging the existing roof covering comply with the requirements of the building code, (R9O7:1) ICE P k OY OTION ! STALI+ED: An Ica barrler that cdnslsts of at least twa Dyers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and s extends at least from the_eava's edge. to -a point at least W no - hes Inside the exterior wall line of the building. (8905.2.7.1) ' ST RUCTURAL COMPONENTS ARE 80UNV; T, - he structural roof coml +onents are � capable of dupporting the roof dovering system and the material qnd equipment loads that will be encountered during Installation of the roof covering system. (8907,2) rzXIsTiNU COVERING 'VI AS REMOVE Wating rc9f covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT US RUSTED METAL t�.� kASHINQ Existing vent flashing, metal edges, drain outWe, collars or metal cpunter- flashing w6re not reinstalled if rdsted, (8997.6) • FL,� HINQ INS'CARLEI �ROP1=PL.Y:' Flashing 'shall bp reconstructed in accordance w ith' a pp roved manufaoturees fnatalIatlop Instructions. Metal flashlhg to which bituminous Materials are to by adhered shall be primed prior to Installation. (R907.6) Lure of Primary Installe -,, pate igrrature of Permit Holder Date