Loading...
Checkoff Sheet MS-20145-00069.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF 13LAIR REROOFING CHECKOFF'7'8H'8ET Return,to Blair City Hall p - fl l'ino cti rJ tb ha ion, 218 S 16" Street, Blair 'NE'6'8008 Because of limitations caused by the Infeasiblifty10 perf6nn would not interfere with reroofing work, plea'$61ndle'ate co with .thafollowing4equire Ments t2a2LAft this reroofing job, Property Add ress. �1 Contractor or Homeq '(If self elf) Permit#: Installation Date: YES NO The materials and methods of application used for recovering or re I pfacIng the eAsting roof covering comply with the, requirements;of the bqlldlng code. ,907, IC PROTECTION I An lee barrier that consists of at least two layers of underlayment or of a self,qdhdrinq polymer modified bitumen sheet was Installed an extends at Least from the ea4s'edcte to '.a p bint at bast 2 A Inches Inside thd6kterlor -wall line of the bujldlrig,(R006.2` STRUCTURAL. COMPONENTS ARE SOUNKL: The structural roof com nts are capable of supporting the roof ooverIng and the mat erj;qj1, and `equIp rqentloads that will be encountered durind installation of the, roof 60'vefjng systeM,� 1 90,742 EXISTING COVERING WAS REMOVED., Existing roof coverin was.femoved one of the reasons required, bytectl6n R907' DID NOT USE RUSTED'. METAL'O' RFLA$HING. !.e e ges, drain outW% collArs or metal .c 'un V�6 reinstall "Ifidated. P tqrrflaW�'g re FLASHING INSTALLED PROPERLY.' Flashing shall be,reco'nstrUcted,in accordance with approV6d which'. bituminous Materials are to be adhered shall be primed prior to installation. (8907,6), 'qi J - J Ig f P ry I aller Me nature eii�Folde • Date