Checkoff Sheet MS-20145-00069.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF 13LAIR REROOFING CHECKOFF'7'8H'8ET
Return,to Blair City Hall p - fl l'ino cti
rJ tb ha ion,
218 S 16" Street, Blair 'NE'6'8008
Because of limitations caused by the Infeasiblifty10 perf6nn would
not interfere with reroofing work, plea'$61ndle'ate co with .thafollowing4equire
Ments
t2a2LAft this reroofing job,
Property Add ress. �1
Contractor or Homeq '(If self elf)
Permit#:
Installation Date:
YES NO
The materials and methods of application used for recovering or re I pfacIng the eAsting
roof covering comply with the, requirements;of the bqlldlng code. ,907,
IC PROTECTION I An lee barrier that consists of at least two layers of
underlayment or of a self,qdhdrinq polymer modified bitumen sheet was Installed an
extends at Least from the ea4s'edcte to '.a p bint at bast 2 A Inches Inside thd6kterlor
-wall line of the bujldlrig,(R006.2`
STRUCTURAL. COMPONENTS ARE SOUNKL: The structural roof com nts are
capable of supporting the roof ooverIng and the mat erj;qj1, and `equIp
rqentloads
that will be encountered durind installation of the, roof 60'vefjng systeM,� 1 90,742
EXISTING COVERING WAS REMOVED., Existing roof coverin was.femoved one
of the reasons required, bytectl6n R907'
DID NOT USE RUSTED'. METAL'O'
RFLA$HING. !.e
e ges,
drain outW% collArs or metal .c 'un V�6 reinstall "Ifidated.
P tqrrflaW�'g re
FLASHING INSTALLED PROPERLY.' Flashing shall be,reco'nstrUcted,in accordance
with approV6d which'.
bituminous Materials are to be adhered shall be primed prior to installation. (8907,6),
'qi J
- J
Ig f P ry I aller Me
nature eii�Folde • Date