Loading...
Checkoff Sheet MS-2014-03253.tif I , INTERNAT I I f CITY F BLAIR REROOFING CHECKOFF Return to Blair Cty Hail prior to Final Inspection 2'18 S '16 i Street, Blair, NB 58008 � Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requirements following this reroofing job. e Permit #:� Installation Date: I,p l YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) -- STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that Wil be encountered during installation of the roof covering system. (R907.2) _ I �- ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 j NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i Signature of Primary installer Date S16naturd of Permit Holder I Date � 09Z96££-Zoti 101.1 aleldwoo d09 :L0969ZJeA i I i