Checkoff Sheet MS-2014-03253.tif I
,
INTERNAT I I f
CITY F BLAIR REROOFING CHECKOFF
Return to Blair Cty Hail prior to Final Inspection
2'18 S '16 i Street, Blair, NB 58008 �
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the fallowing requirements
following this reroofing job.
e
Permit #:�
Installation Date:
I,p l
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
-- STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that Wil be encountered during installation of the roof covering system. (R907.2)
_ I
�- ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3 j
NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
Signature of Primary installer Date
S16naturd of Permit Holder I Date