Loading...
Checkoff Sheet MS-2014-02372.tif 2009 INTERNATIONAL RES CODE - CITY OF BLAIR FIB FF SH Return to Blair City Hall prior to Final inspection 218 S 16 s treet, Blair HE 68008 Because of limitations caused by the infeasibility to vorform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) rl l3 ICE PPOT I"GTIDN ]Ns rALLED: An ice barrier that consists of at feast two layers of I underlaymernt or of a self-adhering polymer modified bitumen sheet was installed and ( extends at least from the eave's edcie to a point at least 24 inches Inside the exterior wall line of the building. (R905.2.7.1) STRl1CTURAL COMPONt;NTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. {R907.2) J ® EXISTING COVERING WAS REi1flOVED. Existing roof covering was removed for one of the reasons required by section R907.3 ® NO DUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) CI FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign re of Primary Installer — Date S a f Permit Hold r ate i i Z - d 0929 L££-Z0t' aoiaa ;x3 aleldwoo dZ �:Lo 9 9Z aeW