Loading...
Checkoff Sheet MS-2014-01794 (2).tif INT N TIA . CITY OF BLAIR REROOFING CHECKOFF SH � Return to Blair City Half prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would I not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Z Installation Date: YES 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) j EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 LISTED METAL OR FLASHING: Existing vent flashing, metal edges, drain N 0 � R outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ' ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance (� FLASH with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature �Prdi kryInMtacer Date • F (yy ° �` ✓'°ate >a per., «.: / Signature oJ P rm' Hol er 5