Checkoff Sheet MS-2014-02263.tif fio
INTERNATIONAL 1
CITE` OF BLAIR REROOFING CHECKOFF SHEET
Return to Blau Cy Hall prior to Final inspection
2'18 S 16 Street, Blair, NE 68000
Because of.limitatlons caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
f2qgWjffl this reroofing job.
Permit M �
}
Installation Date: j
YES NO
r [� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTEC T IQN 1N5 "AI. ED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed e to a point at least 24 inches inside the exterior
wall line of the building. (11905.23.1)
STR[1CTURAL. COMPONENTS ARE SOUND: The structural roof components are
I
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® E CISTiNG COVERING WAS REMOVED: Existing roof covering vjas removed for one
of the reasons required by section 8907.3
NO RUSTED 11tIETAI* OR FLASH Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
_. PLASI-IlNU 1NST'AIrLED pRCtPEiZL.Y: Flashing shall be reconstructed in accordance
vuith approved manufacturer's installation instructions. Metal flashing to ( which
bituminous materials are to be adhered shall be primed prior to installation. 8907.6 )
Signature of Primary Installer Date
Signature f Permit Ho er
Date
E'd 09Z96E£-Z01V a e}eldwoC) dZ6 :Z09 5ZAeW