Checkoff Sheet MS-2014-01794.tif INT N TIA .
CITY OF BLAIR REROOFING CHECKOFF SH �
Return to Blair City Half prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
I
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: Z
Installation Date:
YES 0
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2) j
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
LISTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
N 0
� R
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
' ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
(� FLASH
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature �Prdi kryInMtacer Date
• F (yy ° �` ✓'°ate >a per., «.: /
Signature oJ P rm' Hol er 5