Loading...
Checkoff Sheet MS-2014-02966.tif i I I i MAY -16 -2009 22:31 From: ' 4 i To:4024264195 P.1f1 IENTIAL CODE ' CI I . REROOFING CHECKbFF SHEET R eturn to Blair City ball prig t6 Final Inspection 210 .S 16' street, Blair, NE 68008 Becauso of limitations caused by the Infeasibility to perform detailed Inspections which would not interfere with .reroofing work, plea'se indicate compliance with the following requirsi'nents following this rerooting job. Property Address: contractor or Homeowner (if so.!Q ; ' Permit 0» MS l F installation bate: YES NO The materials and methods of application used for recovering or replacing the existinc, j roof covering comply with the requirements of the building code. (R907A) fl rl ICE PROTECTION INSTALLED: An ice barrier that wnsists of at least twu layers 4f underlayment or of a self-adhering polymer modified biturnen sheet was installed and extends at least from the eaves r Lq to , a point at_Ieas 24 inch6s inside the exterior wail line of the building. (R905.2.7.1) S`fR.UCTU'"RAL COMPO ARE SOUND The structural roof components nrc' capable of supporting the roof covering systeEri and the material and equipment loads that will be encountered during installation of the roof covering sys¢em. (R.907.2) i XIS ING COVERING WAS REMOVED: 5xistirig roof covering was removed for one of the reasons required by section R907.3 DID NOT _USE- RUSTE© METAL QR FLASEiING: Existing vent flashing, metal edges, drain outrets, collArs or metal cpunfer- flashing were riot reinstalled If rusted. (8907.5) FLASHING INSTALLED PROPERLY- Flashing shall be reconstructed In accordance with approved anufacturer's installation) Instructions, Matal flashing to which hituminous terlals are to be adhered shall be primed prior to installation. (R101�.6) . • Signa re o m `installer Date itz r2 �- '§ig o er 1 Holder Date