Checkoff Sheet MS-2014-01670.tif i
i
Mar, 23. 2015 11:51 AM No. 2190 P. 1
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the follo'vving requirements
following this reroofing jobb.I ,, 1
Property Address: yVlsf
Contractor or Homeowner (if self)
Permit #: MS -20W 0\ -J-
Installation bate: CID
I
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside. the exterior
wall line of the building. (8905.2.7.1)
❑ STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will he encountered during installation of the roof covering system- (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
i
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted_ (R907.5)
QI FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approv anufacturer's installation instructions. Metal flashing to which
bitumino mate ials are to be adhered shall be primed prior to installation. (8907.6)
LU
Siguinture Primary Insta Date
N )
i
SigWafure of Permit Holder Date