Loading...
Checkoff Sheet MS-2014-01670.tif i i Mar, 23. 2015 11:51 AM No. 2190 P. 1 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the follo'vving requirements following this reroofing jobb.I ,, 1 Property Address: yVlsf Contractor or Homeowner (if self) Permit #: MS -20W 0\ -J- Installation bate: CID I YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside. the exterior wall line of the building. (8905.2.7.1) ❑ STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will he encountered during installation of the roof covering system- (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 i ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted_ (R907.5) QI FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approv anufacturer's installation instructions. Metal flashing to which bitumino mate ials are to be adhered shall be primed prior to installation. (8907.6) LU Siguinture Primary Insta Date N ) i SigWafure of Permit Holder Date