Loading...
Checkoff Sheet MS-2014-01444.tif 2009 INTERNATI IMA1.11AL: GU CITY OF GLAIR RER O�If G CHECKOFF SHEET Return to Blair City Hail prior tb Final Inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perfonn detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: l� arc. �Crr t� G Contractor or Homeowner ([f self) Permit#: MS - 2014 - - tjL1t1q Installation Date: YES YO The materials and methods of application used fqr recovering or replacing the existing i roof covering comply with the requirements of the building code. (R907A) �Q ICE O f ECTION INSTALLED An ice barrier that consists of at least two la ers of PR T Y � underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) M� STRUCTURAL COMPONENTS ARE SOUND': The structural roof com p onents are capable of support(ng the roof hovering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) G S E OVED: Existing f covering was removed for one EXISTING COVERING WAS ft M _ E g roo g of the reasons required by section R907.3 0 LAS ING. Existing vent flashing, metal edges, � D(D NOT USE RUSTED METAL R F . H g f g, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with' approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.6) AJh A e tp Signature of Prim ry Installer Date Signature of Permit Holder Date