Loading...
Checkoff Sheet MS-2014-01338.tif 03/20/2015 FRI 8:52 FAX 0001 /002 Ar v v ( lI OF A �. OF' IN VH K SHEET Return to Blair City Rall prior to Final Inspection 218 S 16 Street, Blair, NB 68008 Because of lImItations caused by the infeasibility td parform detailed inspections which would ,nut interfere with reroofing work, please indicate compliance with the following requieef ients following this reroofing job. Al Property Address: ©Oq�' Contractor or Homeowner (if self : al% Permit #: MS-2014- Installation Date: YE N O . ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907:1) (� ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self-adhering polymer modified bitumen sheet was installed and j extends et least from the eave's edge to •a point at least 24 inches inside the exterior • wall line of the building, (R905,2,7.1) ' STRUCTURAL COMPONENTS ARE SoUND': The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one j of the reasons required by section R907.3 DiD NOT USE RUSTED METAL OR FLASHING: Existing vent flashir g, metal edges, drain outlets, collars or metal cpunter- flashing wore not reinstalled if rusted. (8907.5) • i • FWHINC INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with' approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907R6) S t ure of Primary Installer Date - R 4signa ' Permit Holder Date i