Loading...
Checkoff Sheet MS-2014-00662.tif i 03/21/2015 SAT 9:13 FAx R X001 /001 UUU' IN TERNATIONAL Tl NAB ^ �I . 1••IA � CITY OF 13LAIR Ill CHECKOFF SHEET Return to flair City Hall prior tv Final inspection 21 S i6 street, Blair, NE 68808 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements foil owIntl this reroofing job. Property Address: j V�' Contractor or Homeowner (if self} • ` " ,Y: , . '` _ Fri ' A Permit #; MS-2 014- ZE Installation Date:` YES . NO The materials and methods of application used fQr recovering or replacing the existing roof covering comply with the requirements of the building code. (ROOM) l ICE PR0'fECTION INSTALLE An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to •a point at least 2 inches inside the exterior wall line of the building. (FM65 2,7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are f y ... capable of support(ng the roof hovering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) KY EXIST COVERING WAS Rl -M0V_ D': Existing roof covering was removed ferone of the reasons required by section 890.3 DID NOT USIA RUSTED Nl>~TAL, Oil l LASHING:. Existing vent fIashirig, metal edges, drain outlets, collars or metal cpunter flashing w6re not reinstalled if rusted. (R907.5) ❑ FWHING iNSTp.LLEDPROPER : 'Flashing shall be reconstructed in accordance 0 with' approved manufac#urer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installatlon. (8907.6) t �n c?G mi n � r ' • , � • Signatu� of prlmaiy installer f Date .,. Gate Sign k fure''of Permit Holder '