Checkoff Sheet MS-2014-03150.tif .009 INTERNATIONAL RESIDENTIAL COD.E
CITY OF 13LAIR REROOFWG CHECK SHEET
Return to Blair City all prior to Final Inspedlon
218 S 16" Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance With the following requirafnents
folloA Un this reroofing job.
r
Property Address:
,.-"Gontractol° e4 Homeowner (if self) I J-
Permit# MS-2014- 63 2 5 3 -)
Installation Dqte-.
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. '(R907A)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building. (K905.2.7.1)
STRUCTURAL,. COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVI D. Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashfng, metal edges,
drain outlets, coRirs or metal counter - flashing wore not reinstalled if rusted. (R907,5)
FWHING INSTALLED P&OPERLY.Flashfng shall be reconstructed in accordance
with approved manufacturer's Installation instructions. i4etal flashin to which
bituminous materials are to b adbeLqd shall be primed prior to installation. (R907.6)
7
at o, Primary lnst lier Date
Signa f Permit Holder Date