Checkoff Sheet MS-2014-01722.tif i
2009 INTERNATIONAL RESIDE CODE
GII OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hail prior to Final Inspection
218S16 th Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would !
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit#: S- )61q
Installation Date: 0
YE,S' NO I
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.71)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
. 9 9 ,
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which '
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I
fir' q,�s
Sign o of Pr' ary Installer Date
Tig of Permit Holder Date
I
i