Loading...
Checkoff Sheet MS-2014-01487.tif 0311912015 07:49 Ta P.0011001 . VIAL . CITY OF !BLAIR REROOPIOG.'CHECK SHEET i Re turn to Bliair City Hall prior tv Final inspection 1 218 S " trGot, Blair, NE 66008 13e0ause of llmltatlons caused lxythe lnfeaslbIllty to perform detalled Inspections which world no Interfere with reroofing warlr, please Indloate compliance with the following req�t[rorsnte fQll gwln this reroofing job, . Property Address: R7 f Gun'tmator or Homeowner (if oel'I) Cb permit 9: MS- 2014 - Q Installation Late: 7 —�� i z � . i YES NO The materials and raethods of opplicatlon used for recovering or replaciing the existing roof povering gompiy with the requirements of the building coda. (R907A) ICE p k OfEC TION I LLEL: An ice barrier that conelsts of at least two layers of undarlayment or of a self polymer modified bitumen sheet w$s rn� d and extends at leas from the save'a edce to ti point at Ig et ?4 inobes .inside the exterior -wall line of the building. (RP06.2.7.1) ' UO UI AL CLI iPa S ARC SOU MA The structural roof components are oapabie of oupporting the roof bovering system and the material qnd equipment loads thit will be encountered dUdng Installation of the root covering system. (R907.2) M ST am COVERING A P-MOV D gating rapf covering wes removed for one of the reasons required bysec #ion R907,3 A DiL NoT usF Rumr=D METAL QR. &LUMMM; Existing vent flashing, metal edges, drain outrats, collars or metal c+punter flashing were not reinstalled if rusted. (R907.5) rL & SMING FIST' ED 1��pEF�L. ° Flashing thall bq reconstructed in accordance vvith' approved manufacturer's installatloo Instructions. Metal flashing to which bituminous rftterlals are to be adhered shall be primed prior to Installatton. (RG07,8), re of P Dry I pate e Date of F' it HaidHolder •