Loading...
Checkoff Sheet MS-2014-01404.tif .r CITY OF 8LAIR REROOPINO SHEET R eturn t o Blair City Ha prior 6 ins. i nspection 218 ` 6" rie , Blair, NE 68088 Because of limitations caused by the Infeasibility to perferm detailed Inspections which would not Interfere with reroofing work, please Indicate`compllance with the following requirepients following this reroofing job. Property Address: Contractor or Homeowner (If self : P a 11 Permit : MS-2014- O Installation Date; 9//N i ACES NCB The materials and methods of application used for recovering or replaQIng the existing roof covering comply with the requirements of the building code. {R907:�) Ef C1 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was I n sta lled and extends at least f'rorn the eayds edge to -a point at least 24 Inches Inside the exterior wall line of the building. (R905a2,7.1) C1 0 C O M PONENTS , ARE SOUNn� The structural roof com onents are STRUCTURAL p capable of supporting the room covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVg Existing roof covering was removed for 'one of the reasons rewired by section R907.3 31D NOT USA I DSTEI3 m mp. - m OR Pl_AS ZING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing ware not reinstalled If rusted. (R907.5) FLASHING INSTALLED PROPER l "Y� Flashin g shall be reconstructed In accordance _ with approved manufacturers tristallattoo Instructions. fetal flashing to which bituminous Materials are to be adhered shall be primed prior to Installatlon. (R907.6), Signature of Pr a Insta D& -3101 Sign ure of Permit Holder Ddte i