Loading...
Checkoff Sheet MS-2014-01127 (2).tif i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOPF SHEET Re turn to lair t t y Hall prior to Fidel Inspection 218 S Street, Blair, NE 6800 Because of limitations caused by the I nfeasibility to perform detailed Inspections whlch wou ld Lot Interfere with reroofing work, please Indicate compliance with the following requirements following thls reroofing job. Property Address o S" ''�— ► f' Contractor or Homeowner (if self) j Permit #.- M-2014- 0 ( 1 'l Installation pate:~ -- t YES NO Lam' The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two Dyers of underlaymsnt or of self-adhering polymer modified bitumen sheet yygl In Iled and extends pt least from the eave's edge to a point W inches inside the exterior wall lute of the building. (R90527.1) STRUCTURAL OMPONENTS ARE 30UND:, The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING YLAS REMOVED • Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING. Exlsting,vent flashing, metal edges, drain outlets, collars or metal counter were not reinstalled If rusted, (R907.5) j FLASHING INSTAL„Lg10 PROPERLY: Flashing small be reconstructed in accordance With approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R907.6) 106 a Signature of P imary nataller Date /Z Q !, Az f Signature of P rmit Holder pate ,lre ce it ni e YD ..2_ q9 rs�, 4/b 4 ocgbZObL 'out `Oui }oea}ua:D uedsv AV K:z9:2 MZ /20 I