Checkoff Sheet MS-2014-01127 (2).tif i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOPF SHEET
Re turn to lair t t y Hall prior to Fidel Inspection
218 S Street, Blair, NE 6800
Because of limitations caused by the I nfeasibility to perform detailed Inspections whlch wou ld
Lot Interfere with reroofing work, please Indicate compliance with the following requirements
following thls reroofing job.
Property Address o S"
''�— ► f'
Contractor or Homeowner (if self)
j
Permit #.- M-2014- 0 ( 1 'l
Installation pate:~ -- t
YES NO
Lam' The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two Dyers of
underlaymsnt or of self-adhering polymer modified bitumen sheet yygl In Iled and
extends pt least from the eave's edge to a point W inches inside the exterior
wall lute of the building. (R90527.1)
STRUCTURAL OMPONENTS ARE 30UND:, The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING YLAS REMOVED • Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING. Exlsting,vent flashing, metal edges,
drain outlets, collars or metal counter were not reinstalled If rusted, (R907.5) j
FLASHING INSTAL„Lg10 PROPERLY: Flashing small be reconstructed in accordance
With approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R907.6)
106 a
Signature of P imary nataller Date
/Z Q !, Az f
Signature of P rmit Holder pate
,lre ce it ni e YD ..2_ q9 rs�,
4/b 4 ocgbZObL 'out `Oui }oea}ua:D uedsv AV K:z9:2 MZ /20
I