Checkoff Sheet MS-2014-01036.tif AUUV UNI1 I
CITY O�
Re .tin to Blair G ty Halt Prior to, Final Inspection
218 S le Strest, Blair, NB 68008
I
limb rrs caused b the 1rtt slbili tp pericrm detailed inspections which vaauld
Because, of !not Interlere with reroofing work, please intiloato carnpliavpe with the following requirements
titles C this roofirlg lots.
Ile Properly �
`� r3c� irr'
contractor or, i
S 20
lnstslla#lon Data: � oU �! � c.�,. y , t`lvv
YES NO
Tha materials and methods of eppitcatton used for recovering or replaoing the s sting
roof Vering gDrnply'vrlttt the require
of the building cods. {i�9ti7:1} �
C�
lC i tT i1 iq q`a . LED* An I+ barrier that nsts� of at Est fit layers of
urtde ant or of a self-adherin g p Modified bitumen slreat W ins and
6xte s l tfrra fie y e d e tee-a point a t lest Inds Itrside the e erlor
�vaIl l no of the building, R06,2.7.1)
' � YR CTbIRAL C prig oN�, S _� , JIB: Ike structural root rt porsn
ca hie p stsppo g e roof covering system and the mateft and equipment loads �
that lil be ar6untered during Installation of the roof covering system. (ROO72)
I
t V M. existing rpof covering was removed for on$
of the rmona raqulreq by aeoluon R 907 . 3
ISE i . Existing vent flashing, metal edg , !
dW otrti , collate or t €xsur e ashts?g vrsre not reinstalled rta d. P07.$
ii I
. l �r ff ALL — EM! PRMP � p3asbing s h a ll bp r s�cted r accordance
r Installavoo Inatruotions. ,tat i tlashl g to whlci
Installation (i€37.g.
bitrisls are Sd be adhered alb #1 be prlrned prior e a
lgnatu rY s filer Data
Signs re I?bIl Holder late
9
li
i
I