Loading...
Checkoff Sheet MS-2014-00759.tif i i I I 2009 INTERNATIONAL RESIDENTIAL COD Cpl B LAIR REROOFING CHECKOFF SHEET Return to Blair City Hail prior to Final Inspection 218S 16 th Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements io this reroofing job, Permit #: Installation Date: "/ YE,S' NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are I capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) - Sign o of Pr' ary Installer Date 3 -�g�15 Siqnati.w6 of Permit Holder Date