Loading...
Checkoff Sheet MS-2014-00668.tif CITY RR� R R \RwQ�R t 4aR i��a` ■, Rb/ Rw.■•�r R • Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing wont, please indicate compliance with the following requirements folly this reroofing job. �4- Property Address: Contractor or Homeowner (if self) :G i Per mit #- MS-2014- l Installation date; /S YES NO I The materials and methods of application used for recovering or replacing the existing I roof covering comply with the requirements of the building code. (R901A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building, (R906.2.7.1) j STRUCTURAL COMPONENTS ARE SOUND'-. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered d0rfng installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE DUSTED META. OR FLASHING. Existing vent ffashtng, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907,5) PLASHING INSTALLED PIC}PERLYI` Plashing shall be reconstructed in accordance with' approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907,6) Sign tune of Primary In taller Date Fr Signa u e of Permit Holder bate i