Loading...
Checkoff Sheet MS-2014-00648.tif A&4%P V• lilt A 18,41 ILA A 1%0 - XI N4 A V A IMF 1r..rI w. A CIT OF 81AR REROO PING'CHECKOFF SHEET I- Return to Blab Cit Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followinsi this reroofing job. �1 = Property Address: Contractor o ' ! r Homeowner (if self) x /�� / �. ,. ;,� - •�'= . -,f.,: , ,� :,;, ;,, • - Permit #: MS -2014 - : ; Installation Date; = YES NO The materials and methods of application used fcr recovering or replacing the existing roof covering comply with the requirements of the building code. (P�907 :9) Q ICE P OY CTION INSTAt,l.E An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to -a point at least 24 inches inside the exterior • wall line of the building. (11905.2.7.9) I STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are' capable of supporl:ing the roof covering systeni and the material and e-quipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WA REMOV Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE. RUSTED METAL OR KAsm w: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (11907.5) FWHING INSTALLED PROPERLY. flashing shall be reconstructed in accordance with - approved manufacturer's installation} instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6), j signature of Primary Installer Date signature of Permit Holder Date • Y ♦ I