Loading...
Checkoff Sheet MS-2014-00596.tif i R ^® ® ® AR A A Soma P"A RA( A A A W® A MK RMM A ,MM® RM.- wagA R. R .RA r CITY OF I . PIN` ' Return to Nair City liall prior tb Final Inspection j 218S 16 th Strreet, Blair, NE 68006 Because of limitations caused by the infeasibility t9 perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements folly this reroofing job. Property Address-, ..;... t; Contractor or Homeowner if self) i ►permit #: MS-2014- Installation Date, YES . ❑ The materials and methods of application used fpr recovering or replacing the existing roof covering comply with the requirements of the building code, (P,907A) ` ❑ ICE PkOYECTION INSTALLED Mica barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge_ to a point at least 24 inches inside the exterior wall line of the building. (R005.2.7.1) STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are t capable of supporting the roof hovering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED FETAL OR FEMHINC: Existing vent flashing, metal edges, i` drain outsets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) EWHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with' approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) SNr`ature of Primary lnstafler L44ww Date S mature of Permit Holder Date i