Checkoff Letter MS-2014-01625.tif i
I
W-V
CITY Of B
is of C�
i
SELF March 17, 2015
Blair NE 68008
Permit Number: MS- 2014 -01625
Roof and siding
Permit Address: 544 S 25th St
DearContractor,
The Roofing Inspection for the above referenced permit has passed inspection, but
no Roofin g Checkoff Sheet has been turned in for this permit. A signed Roofing
Checkoff Sheet is required as certification that all work was performed in
accordance with the 2009 Building Code.
A blank Roofing Checkoff Sheet is enclosed for your convenience. Please complete
the form immediately and return it by email (stormdamage @ci.blair.ne.us), by fax
(402.426.4195) or by mail (218 S 16th St, Blair, NE, 68008).
If you do not return a completed Roofing Checkoff Sheet within 60 days of the date
of this notice, you will forfeit the $50.00 deposit associated with this permit and we
will turn this issue over to the City of Blair Licensing Board and City Attorney to
consider suspending your contractor registration.
i
If you have questions about the Roofing Checkoff Sheet, please call the Blair
Building Department at 402.426.4191.
Thankyou in advance for your cooperation in this matter.
i
Sincerely,
?V 6N.'e-'W
Phil Green
Assistant City Administrator
i
a,POa.a
218 South 16th Street • Blair, Nebraska 68008 • 402 -426 -4191 • Fax 402 -426 -4195 + E -mail cityofblalr @ci,blair,ne us