Checkoff Sheet MS-2015-00084.tif 2009. INTERNATIONAL RESIDENTIAL COME
CITY OF 13LAIR REROOPIN CHE H
EET
Return to Blair City Hall prio"r to Final'inspectio
w
218 S 16 Street, Blair, NE 68008
Because Of limitations caused by the infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, plea'se indicate c o with the following: requiretrients
followina this reroofing job.
Property Add ress:
4-)
Contractor or Homeowner (if self)
i�2 V--
/5
Permit #a MS-2044 065,
Installation Date: Atr&k
YES NO
The materials and methods of application used fQr recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907:1),
ICE PkOTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at from th(�eav&s�d g
least "e d g e to'a point at least �
24 inches Inside the VY� _
wall line of the building. '(R90621A)
STRUCTURAL COMPONENTS ARE SOUN5-. The structural roof c omponents o.mponentp are
capable of supporting the, roof tovering'systerri and the materipl,M'' equi pment loads
d
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for 'one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FW9HING: Existing vent flashing, metal edges,
drain outlets,, collars or metal counter-flashing were not reinstalled ffriiifed.
' LLASHING INS reconstructed INS P ROPERLY. , ' shall ba�ro o , I
with approv'ed"'m'anijfa'dturees'lnstallatiog instructions' M6t I'flashlfig to whlch
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
.
gnatb s
of P"M FaTler
nature.,o e Holder late