Loading...
Checkoff Sheet MS-2015-00084.tif 2009. INTERNATIONAL RESIDENTIAL COME CITY OF 13LAIR REROOPIN CHE H EET Return to Blair City Hall prio"r to Final'inspectio w 218 S 16 Street, Blair, NE 68008 Because Of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work, plea'se indicate c o with the following: requiretrients followina this reroofing job. Property Add ress: 4-) Contractor or Homeowner (if self) i�2 V-- /5 Permit #a MS-2044 065, Installation Date: Atr&k YES NO The materials and methods of application used fQr recovering or replacing the existing roof covering comply with the requirements of the building code. (R907:1), ICE PkOTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at from th(�eav&s�d g least "e d g e to'a point at least � 24 inches Inside the VY� _ wall line of the building. '(R90621A) STRUCTURAL COMPONENTS ARE SOUN5-. The structural roof c omponents o.mponentp are capable of supporting the, roof tovering'systerri and the materipl,M'' equi pment loads d that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for 'one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FW9HING: Existing vent flashing, metal edges, drain outlets,, collars or metal counter-flashing were not reinstalled ffriiifed. ' LLASHING INS reconstructed INS P ROPERLY. , ' shall ba�ro o , I with approv'ed"'m'anijfa'dturees'lnstallatiog instructions' M6t I'flashlfig to whlch bituminous materials are to be adhered shall be primed prior to installation. (R907.6) . gnatb s of P"M FaTler nature.,o e Holder late