Checkoff Sheet MS-2014-03339.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF 13LAIR REROOFWG CHECKOFF SHEET
Return to Blair City all prior t6 Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
tot interfere with reroofing work, please indicate compliance with the following requireffients
followin this reroofing job.
Property Address,
Contractor or Homeowner (if self)
Permit'm MS-2014- 6? S3Y9
Installation Date.-, �/Z
YES NO
The materials and methods of application used fQr recovering or replacing the existing
roof covering qomply with the requirements of the building cod'
a. (R907A)
ICE PkOfECTION INSTALLED: An ice barrier that consists of at least two layers of
# underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at [east from the eave's edge to -a point at least 24 inches inside the exterior
- wall line of the building. (8005.2.7.1)
STRUCTURAL COMPO ARE SOUN5-. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed foro'ne
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR LA Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing wore not reinstalled if rusted. (R907.5)
C!V/,FWHING INSTALLED PROPE shall be reconstructed in accordance
with approved manufacturer's installation, instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (3907.6)
L
g nat ary In aI Date
ure of Permit ev Date