Checkoff Sheet MS-2014-03337.tif I
2009 INTERNATIONAL RESIDENTIAL COD,E
CITY OF 13LAIR REROOFI�Q CHECKO'FF SHEET
Return to lair City all prior to final Inspection
2 tree, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following require
folly this reroofing job.
Property Address: Z .
Contractor or Homeowner if self) e 1
Permit -2014- -
I
Installation Dater �7
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. R907, l
ICE PROTECTION INSTALLED An ice barrierthat consists of at least two layers of j
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to •a point at least 24 inches inside the exterior
• wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUN5.4 The structural roof components are
capable of supporting the roof covering systeni and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
I
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
DID NOT USE. RUSTED METAL OR PLASHING; Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
WRING INSTALLED PROPER L`Cx Flashing shah be reconstructed in accordance
with approved manufacturer's instalaatlot') instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6)
G a r of ry Ir alter Z Date
gnature er o er Date