Checkoff Sheet MS-2014-03021.tif INTERNAT RESIDENTI
CITY F BLAIR REROOFING CHECKOFF H T
Return to Blair C tty Hall prior to Final Inspection
21 5 S '16 Street, Blair, NE 65000
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements !
following this reroofing job.
t
Property Address: 1c, 1�
Contractor or Homeowner (if self)
i
Permit #: IVIS- 2014
Installation Date: / I
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists t t of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
CJ
I
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.5)
el4q 1 6 1(
Signature of Prim ry Installer Date
Sign Gr of Per it Holder bat
i