Loading...
Checkoff Sheet MS-2014-03021.tif INTERNAT RESIDENTI CITY F BLAIR REROOFING CHECKOFF H T Return to Blair C tty Hall prior to Final Inspection 21 5 S '16 Street, Blair, NE 65000 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements ! following this reroofing job. t Property Address: 1c, 1� Contractor or Homeowner (if self) i Permit #: IVIS- 2014 Installation Date: / I YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists t t of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) CJ I ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.5) el4q 1 6 1( Signature of Prim ry Installer Date Sign Gr of Per it Holder bat i