Loading...
Checkoff Sheet MS-2014-01456.tif 'Iar I b I b Ul :'Gbp LKU 4U2bb1 UUW p.I M _ 1' ' I . REROOPIN CHECKOFF SHEET Return to Blain City Rall prior to Final inspection 218 S 16 Street, Stair, NE 68008 � 3ecause of limitations caused by the infeasibility to parforrri detailed inspections which would Lot interfere with reraoring work, please indicate compliance with the following requirerr[ents Qllcti lnq this reroofing job. 'raperty Address: � � , :ontractor or Ha nneownsr (if self) : a 'J ermitg. MS-2014- Istallation Date; � ` Z e) - Z Z ' ES NO The miatedefs and methods of application used for recovering or replacing the existin roof covering gomply with the requirements or the building code. (R90?A) 9 ICE MOTECTION INSTALLED: An ice barn er that consists of at least two layers of underfayment or of a self adhering polymer modified bitumen sheetwas installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior -wall line of the building, (R905.2.7.1) ST'RUQTURAL COMPONENTS ARE SQUM: The structural roof components are f capable of cupporting the roof covering system and the material and equipment Loads that will be encountered quring Installation of the roof covering system. (8907.2) E}CISTING COVERING WAS REMOVEM. Existing riot covering was removed for one of the reasons required by section R907.3 DID NOT USE. RUSTED METAL OR FLASHING; .Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing wire not reinstalled if rusted. (R907,5) TL INSTALLED PROPERLY: Flashing shali be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prig to installation. (R907,6) re of P ' aller to Permit de ate