Checkoff Sheet MS-2014-01456.tif 'Iar I b I b Ul :'Gbp LKU 4U2bb1 UUW p.I
M _
1' ' I . REROOPIN CHECKOFF SHEET
Return to Blain City Rall prior to Final inspection
218 S 16 Street, Stair, NE 68008 �
3ecause of limitations caused by the infeasibility to parforrri detailed inspections which would
Lot interfere with reraoring work, please indicate compliance with the following requirerr[ents
Qllcti lnq this reroofing job.
'raperty Address: � � ,
:ontractor or Ha nneownsr (if self) : a
'J
ermitg. MS-2014-
Istallation Date; � ` Z e) - Z Z '
ES NO
The miatedefs and methods of application used for recovering or replacing the existin
roof covering gomply with the requirements or the building code. (R90?A) 9
ICE MOTECTION INSTALLED: An ice barn er that consists of at least two layers of
underfayment or of a self adhering polymer modified bitumen sheetwas installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
-wall line of the building, (R905.2.7.1)
ST'RUQTURAL COMPONENTS ARE SQUM: The structural roof components are f
capable of cupporting the roof covering system and the material and equipment Loads
that will be encountered quring Installation of the roof covering system. (8907.2)
E}CISTING COVERING WAS REMOVEM. Existing riot covering was removed for one
of the reasons required by section R907.3
DID NOT USE. RUSTED METAL OR FLASHING; .Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing wire not reinstalled if rusted. (R907,5)
TL INSTALLED PROPERLY: Flashing shali be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prig to installation. (R907,6)
re of P ' aller to
Permit de ate