Loading...
Checkoff Sheet MS-2014-00986.tif 2009. INTERNATIONAL RES IDENTIAL D CITY OF I3LAIR RER®CFWG CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection I 21 8 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following_ this reroofing job. Property Address: j Contractor or Homeowner (if self) Permit #: MS 2014- Installation Date: YES NO ® The materials and methods of application used for recovering or replacing the existing j roof covering comply with the requirements of the building code. (R907A) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) S ignature of Pri a Ins r D to j Signature of Permit Holder Date