CITY OF I3LAIR RER®CFWG CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
I
21 8 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following_ this reroofing job.
Property Address:
j
Contractor or Homeowner (if self)
Permit #: MS 2014-
Installation Date:
YES NO
® The materials and methods of application used for recovering or replacing the existing j
roof covering comply with the requirements of the building code. (R907A)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building. (R906.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
S ignature of Pri a Ins r D to j
Signature of Permit Holder Date